1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 56 | 58 | 52 | 58 | 58 | 57 | 5.65 |
Beam Available but Not in Use | 50 | 38 | 0 | 0 | 0 | 0 | 0 | 0 | 1.46666666666667 |
Beam Not Available or Unacceptable | 10 | 22 | 4 | 2 | 8 | 2 | 2 | 3 | 0.883333333333333 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 10 | 18 | 60 | 60 | 60 | 60 | 60 | 60 | 6.46666666666667 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 50 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 1.53333333333333 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 40 | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
Comments: at 16:12 lost connection with HV crates, T1 and T5 rates 10 Hz, but deadtime 17 %. reseted the right arm HV, restarted the portservers, the right arm HV were off, TS0 frozen, reseted right arm trigger supervisor (TS0);
Data Entry by: Coman