    Shift start after run#3241.
    00:27 MCC notify that they will do pathlength measurment for 30 minutes.
    00:36 MCC call, they will not do pathlength measurment tonight.
    but beam is down now.
    00:42 No Beam, MCC have a problem with power supply. it will take about a hour.
    06:00 Beam on target.
    07:08 reset the RunControl.
    07:55 MCC took away beam to reset the magnet.

    run#3241 start 23:40, end 00:43. 615K events.
    run#3242 start 05:43, end 05:50. 40K events. (test run)
    run#3243 start 05:52, end 06:41. 584K events. (run stoped because of ROC failed)
    run#3244 start 06:42, end 07:07. 245K events, (run stoped because of ROC14 failed)
    run#3245 start 07:14, end 07:55. 478K events, (run stopped becuase of no beam)