User name J. Cha
Log entry time 08:01:55 on April 1,2001
Entry number 59679
keyword=Shift Summary
Shift start after run#3241.
00:27 MCC notify that they will do pathlength measurment for 30 minutes.
00:36 MCC call, they will not do pathlength measurment tonight.
but beam is down now.
00:42 No Beam, MCC have a problem with power supply. it will take about a hour.
06:00 Beam on target.
07:08 reset the RunControl.
07:55 MCC took away beam to reset the magnet.
run#3241 start 23:40, end 00:43. 615K events.
run#3242 start 05:43, end 05:50. 40K events. (test run)
run#3243 start 05:52, end 06:41. 584K events. (run stoped because of ROC failed)
run#3244 start 06:42, end 07:07. 245K events, (run stoped because of ROC14 failed)
run#3245 start 07:14, end 07:55. 478K events, (run stopped becuase of no beam)