    User name mitchell

    Log entry time 08:39:03 on April 7,2001

    Entry number 59999

    keyword=cryo target

    Thanks to outstanding effort by Dave Meekins, Ed Folts and the survey group the target is ready to go. The vacuum is at ~3*10-6 Torr.

    JT Valve offsets
    loop 1 -33.15
    loop 2 -00.87
    loop 3 17.7
    pre-cool -00.41

    H2 warm pressure ~ 44.5 PSIA
    D2 warm pressure ~ 46 PSIA

    Gas Panel valve lineup verified, tank valves verified
    I have called MCC and requested a cooldown of a 15 K target