• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 00:18:00 on April 15, 2001

    Entry number 60528

    keyword=Beam Time Accounting
    Hall A

    4/14/2001 1600-2400
    Experiment #: e98108
    Shift Leader: Chang
    Shift Workers: Lianyan Zhu, Bogdan W, The third arm crews

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 40 0 0 1 30 0 2.16666666666667
    Beam Available
    but Not in Use
    0 0 0 30 30 0 30 1 2.5
    Beam Not Available
    or Unacceptable
    0 0 0 30 30 0 0 0 1
    Accelerator Con-
    figuration Chage
    1 1 20 0 0 0 0 0 2.33333333333333
    Experiment
    Ready
    0 30 1 30 30 1 30 0 4
    Planned Config-
    uration Change
    1 30 0 0 0 0 0 0 1.5
    Unplanned
    Experiment Down
    0 0 0 30 30 0 30 12.5
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 30 30 0 30 60 2.5

    Comments: Done with work in the hall at about 17:30 and MCC is ready to send beam to the hall. There are some problems with cabling as expected for most of the starting experiments. However, thing is better than it sounds; we see narrow TDC peaks between blocls and signals from the right arm. The real to random rations for blocks in the back wall are very good.

    Data Entry by: Chang