Main INDEX
Monthly INDEX
PREV
NEXT
User name X. Zhu
Log entry time 12:14:23 on April20,2001
Entry number 60959
keyword=Gas Cerenkov test
1.00 Switching the polarity of the right arm to start the test
Both spectrometers negative polarity; 2.5 GeV, at 30 degrees
run # ~3724: prescale factors not correct;
3:48am: run #3725 left arm cherenkov test, 2.5 GeV/c, 10microA;
4:05am: MCC called, beam off 10 min for QE measurement;
4:21am: run #3726 left arm cherenkov test, 2.5 GeV/c, 15 microA;
4:42am: run #3727 left arm cherenkov test, 2.5 GeV/c, 30 microA;
5:46am: run #3729 left arm cherenkov test, 1.0 GeV/c, 30 microA;
5:58am: run #3730 left arm cherenkov test, 1.0 GeV/c, 30 microA;
the regulator for the right arm dipole were switched on, and the dipole works fine now;
6:28am: run #3733 right arm cherenkov test, 2.5 GeV/c for right arm and 1.0 GeV/c for left arm , 30 microA;
6:33am: run #3734 right arm cherenkov test ,2.5GeV/c for right arm and 1.0GeV/c for left armm , 30 microA;
7:20am: run #3739 right arm cherenkov test ,2.5GeV/c for right arm and 1.0GeV/c for left arm , 30 microA;
7:45am: change central momentum of right arm to 1.0GeV/c;
7:43am: run #3741 left arm cherenkov test, 1.0GeV/c;
7:55am: run#3742 left arm cherenkov test ,1.0GeV/c;
8:00 am : run#3743 left arm cherenkov test ,1.0GeV/c;
8:05am: run#3744 left arm cherenkov test ,1.0GeV/c;
prescale were changed back from 40 to 45 due the high rate problem caused in daq system.
run#3745-run3752 left arm cherenkov test ,1.0GeV/c;
10:01am: run#3753 both arms at 1.0GeV/c , cherenkov test;
10.15am: changed high voltage for L-pr1-ch3 :1625->1675
L-pr-ch14:1434->1404
10:26am: run#3755 both arms at 1.0GeV/c cherenkov test;
10:49am: change left arm from 1.0 GeV/c to 2.0GeV/c
10:49am: run#3756 right arm cherenkov test at 1.0GeV/c
11:14am: run#3757 right arm at 1.0GeV/c and left arm at 2.0GeV/c
11:33am: run#3758
11:52am: run#3759
12:00pm The beam has shut off.
12:03pm run #3760: ped run, wrong prescale factors;
12:05pm run #3761: pedestal run.