0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1 | 1 | 1 | 30 | 20 | 45 | 0 | 0 | 4.58333333333333 |
Beam Available but Not in Use | 0 | 0 | 0 | 30 | 40 | 15 | 1 | 1 | 3.41666666666667 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 30 | 20 | 45 | 0 | 0 | 4.58333333333333 |
Planned Config- uration Change | 0 | 0 | 0 | 30 | 40 | 15 | 1 | 1 | 3.41666666666667 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 12:00 am Rate tests, spectrometer tro -2.5 GeV; 02:00 2.5 GeV, 9-foil run. 03:05 Access for 3rd arm, spectrometer to ~1.0 GeV; 5 am Right arm runs.; 05:45 Access to remove n det., rotate Left Arm, install DVCS det. 08:00 Still in controlled access
Data Entry by: Ent