    User name adaq

    Log entry time 07:58:28 on April 24, 2001

    Entry number 61229

    keyword=Beam Time Accounting
    Hall A

    4/24/2001 0000-0800
    Experiment #: commissioning
    Shift Leader: Ent
    Shift Workers: Camsonne, Sato, Wood/Higinbotham

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    1 1 1 30 20 45 0 0 4.58333333333333
    Beam Available
    but Not in Use
    0 0 0 30 40 15 1 1 3.41666666666667
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 30 20 45 0 0 4.58333333333333
    Planned Config-
    uration Change
    0 0 0 30 40 15 1 1 3.41666666666667
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 12:00 am Rate tests, spectrometer tro -2.5 GeV; 02:00 2.5 GeV, 9-foil run. 03:05 Access for 3rd arm, spectrometer to ~1.0 GeV; 5 am Right arm runs.; 05:45 Access to remove n det., rotate Left Arm, install DVCS det. 08:00 Still in controlled access

    Data Entry by: Ent