Hyper-white scan run summary:
16:55 The 15cm LH2 is in position. Request 90 uA of beam using the 2x2
raster, centered at X=+1.0 , Y=0.0.
17:15 Run 3879 is a test of the prescale factors;the right dipole had not settled
to 1.065 GeV/c yet.
17:35 The collimators for both arms have been set to "open". The right dipole
has still not yet settled to 1.065 GeV/c.
17:55 The right spectrometer has reached 1.065 GeV/c.
Begin run 3880: Momentum setting #1, open collimators, LH2 target.
18:14 MCC lost an IOC; beam will be down for a little while.
We stop run 3880, and start changing the collimators.
18:24 Both collimators are set at 6 msr; beam has not been restored.
19:00 Beam is back; IOC problem at MCC fixed.
Begin run 3881: Momentum setting #1, 6 msr collimators, LH2 target.
19:25 End run 3881. Ramp the spectrometers down to 1.0437 GeV/c.
19:35 Spectrometers are stabilized at 1.0437 GeV/c.
Begin run 3882: Momentum setting #2, 6 msr collimators, LH2 target.
20:00 End run 3882.
Move the collimators to the "open" position.
20:08 Collimators are "open".
Begin run 3883: Momentum setting #2, open collimation, LH2 target.
20:28 End run 3883.
Set spectrometers to 1.0228 GeV/c.
20:38 Spectrometers are stabilized at 1.0228 GeV/c.
Begin run 3884: Momentum setting #3, open collimation, LH2 target.
20:58 End run 3884.
Move to the 9-foil carbon target.
21:02 Request beam with the raster turned off.
21:04 Begin run 3885: Momentum setting #3, open collimation, optics target,
raster turned off.
21:10 End run 3885.
Change the collimation to 6 msr.
21:17 Collimators are set to 6 msr.
Begin run 3886: Momentum setting #3, 6 msr collimation, optics target,
raster is turned off.
21:23 There were ROC communication errors during run 3886. All of the ROCs
seemed to be alive, though.
Begin run 3887 with the same conditions.
21:29 End run 3887.
Move to the 15 cm LH2 target.
21:32 The LH2 target is in position. Request beam with the 2x2 raster pattern.
21:33 Beam is on.
Begin run 3888: Momentum setting #3, 6 msr collimation, LH2 target.
21:44 The computer deadtime is going up to around 60%.
End run 3888.
Begin run 3889: Momentum setting #3, 6 msr collimation, LH2 target.
The deadtime is back to about 18% now.
22:00 End run 3889.
Ramp spectrometers to 1.0023 GeV/c.
22:08 Spectrometers have stabilized at 1.0023 GeV/c.
Begin run 3890: Momentum setting #4, 6 msr collimation, LH2 target.
22:31 End run 3890.
Change collimation to the "open" position.
22:37 Collimators are in the "open" position on both spectrometers.
Begin run 3891: Momentum setting #4, open collimation, LH2 target.
22:54 End run 3891.
Change the spectrometer momenta to 0.9823 GeV/c, and change to the
9-foil optics target.
22:58 Optics target is in position, request beam with the raster off; the spectrometers
have not quite stabilized yet.
23:04 The spectrometers have stabilized at 0.9823 GeV/c.
Begin run 3892: Momentum setting #5, open collimation, optics target,
raster turned off.
23:09 End run 3892.
Change spectrometer collimation to 6 msr.
23:15 Spectrometer collimation is 6 msr on both arms.
Begin run 3893: Momentum setting #5, 6 msr collimation, optics target,
raster is turned off.
23:20 Move to the LH2 target.
23:25 The 15 cm LH2 target is in position. Request beam with the 2x2 raster
pattern.
Begin run 3894: Momentum setting #5, 6 msr collimation, LH2 target.
23:50 End run 3894.
Change spectrometer collimation to "open".
23:55 The collimators are in "open" position.
We are ready to take the last data run, but there is suddenly a problem in the
injector. MCC cannot deliver beam to us right now; they have called the
injector-on-call.
The last data run would be the open collimation run on LH2 at this
spectrometer setting of 0.9823 GeV/c.