• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Saha

    Log entry time 16:03:30 on April25,2001

    Entry number 61362

    keyword=Shift Summary

    Shift Summary

    e99007 Spectrometer Alignment Studies.
    0800: Run 3902 9 foil carbon, nominal tuning, OK
    Harp done OK
    Run 3903 4cm LH2 target, nominal tuning target off center, main see upstream
    window,
    Run 3904 Junk Run
    Run 3905 4cm LH2 target, Dipole+Q1
    Run 3906 Junk Run
    Run 3907 9 foil, Dipole+Q1
    Run 3908 9 foil, Dipole+Q2
    Run 3909 9 foil, Dipole+Q3
    run 3910 9 foil, Dipole+Q1 (Q1 696.96)
    Run 3911 9 foil, Dipole+Q1 (Q1 634.31)
    Beam off 11:15 problem with slit control in injector
    Beam on 13:18, using Hall B slit
    Run 3912 Single 12C foil, Dipole+Q1(704.3 - nominal value)
    Run 3913 Junk Run
    Run 3914 Single 12C foil, Dipole+Q2
    Run 3915 Single 12C foil, Dipole+Q3
    Run 3916 Single 12C foil, nominal tuning, Dipole+Q1Q2Q3.
    Run #917 Junk Run
    Run 3918 Single 12C foil, Nominal tune for Dipole+Q2Q3, and 70% Q1
    Run 3919 Junk Run
    Run 3920 Single 12C foil, Nominal tune for Dipole+Q1Q3, and 70% Q2
    Run 3921 Single 12C foil, Nominal tune for Dipole+Q1Q2, and 70% Q3
    1600: e99007 Spectrometer alignment studies is finished