Main INDEX
Monthly INDEX
PREV
NEXT
User name Saha
Log entry time 16:03:30 on April25,2001
Entry number 61362
keyword=Shift Summary
Shift Summary
e99007 Spectrometer Alignment Studies.
0800: Run 3902 9 foil carbon, nominal tuning, OK
Harp done OK
Run 3903 4cm LH2 target, nominal tuning target off center, main see upstream
window,
Run 3904 Junk Run
Run 3905 4cm LH2 target, Dipole+Q1
Run 3906 Junk Run
Run 3907 9 foil, Dipole+Q1
Run 3908 9 foil, Dipole+Q2
Run 3909 9 foil, Dipole+Q3
run 3910 9 foil, Dipole+Q1 (Q1 696.96)
Run 3911 9 foil, Dipole+Q1 (Q1 634.31)
Beam off 11:15 problem with slit control in injector
Beam on 13:18, using Hall B slit
Run 3912 Single 12C foil, Dipole+Q1(704.3 - nominal value)
Run 3913 Junk Run
Run 3914 Single 12C foil, Dipole+Q2
Run 3915 Single 12C foil, Dipole+Q3
Run 3916 Single 12C foil, nominal tuning, Dipole+Q1Q2Q3.
Run #917 Junk Run
Run 3918 Single 12C foil, Nominal tune for Dipole+Q2Q3, and 70% Q1
Run 3919 Junk Run
Run 3920 Single 12C foil, Nominal tune for Dipole+Q1Q3, and 70% Q2
Run 3921 Single 12C foil, Nominal tune for Dipole+Q1Q2, and 70% Q3
1600: e99007 Spectrometer alignment studies is finished