• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 19:26:20 on June 5,2001

    Entry number 62001

    keyword=Reference cell inspection

    We went into hall to inspect the target (with radcon approval).
    The target ladder is slightly shifted to beam left (5/32"-3/16").
    It was also slightly tilted vertically (downstream was down by ~1/8"-3/16").
    I tilted the vertical back.

    At about 2" from the end is the joint of window to the main body, which
    is slightly bulge out.