• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name kramerk

    Log entry time 08:20:04 on June 6,2001

    Entry number 62097

    keyword=Shift Summary

    Shift Summary
    12am - 2:30am Making adjustments to raster size. MCC having trouble adjusting it to correct size. Moller magnets turned on. Beam in much better shape. Moved the beam spot 1mm in x-direction
    2:30 - 3:02 Doug Higinbotham performing ARC measurement. Doug had some trouble with the measurement. Will have to do later. Moving the cell to reference cell position.
    3:02-3:20 Run on Empty Reference Cell @5uA
    3:20-3:40 Filled with N2
    3:40-4:00 Run with N2 @5uA
    4:00-4:20 Beam Down
    4:20-5:20 Running on N2 @8uA
    5:20-8:00 Measured pressure curve of N2 and He4

    run# 1388/20388 carbon data, looking for all the carbon foils,found them.
    run# 1389/20389 Junk. Accidental start of run.
    run# 1390/20390 Reference cell at 22psig (2.5 atm) short run at 5 uA. Beam tripped.
    run# 1391/20391 Beam junky, prescalars not set correctly.
    run# 1392/20392 2.5 Atm N2 run
    run# 1393/20393 5.0 Atm N2 run
    run# 1394 - 1398 N2 pressure curve and He4 pressure curve
    run# 1399 run on empty ref. cell @ 3uAmps