    User name K. McCormick

    Log entry time 07:57:54 on June13,2001

    Entry number 62963

    keyword=Wed. OWL Shift Summary

    12-1: Beam came back. Checked unrastered and rastered size. Did harp scans.
    The OTR never got a good signal on it.
    1-1:10: NMR. Switched to helium cell to begin running.
    1:30: First run on polarized He target (Run 1534, 20534)
    2:30: Second run (run 1535, 20535): Good run
    3:00 Beam down for 15 min
    3:15: Beam back. Start run 1536, 20536
    4:00 Beam off for 15 min. 4:15: Beam Back. Start Run 1537, 20537
    5:26: End run 1537. Turn off beam for NMR measurement
    5:45-6:30: Target motion problems. See the log entry by Kevin Kramer.
    6:30: Request beam. The target motion FSD won't clear. We decide to
    have an access and look at the FSD switches.
    7:50: Looks like there is a "hysterisis" in target position. A separate
    problem with FSD which ACC will investigate.