0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 5 | 0 | 0 | 0 | 15 | 45 | 30 | 40 | 2.25 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 20 | 0.333333333333333 |
Beam Not Available or Unacceptable | 55 | 45 | 60 | 60 | 45 | 15 | 30 | 0 | 5.16666666666667 |
Accelerator Con- figuration Chage | 0 | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0.25 |
Experiment Ready | 1 | 45 | 1 | 1 | 1 | 1 | 1 | 40 | 7.41666666666667 |
Planned Config- uration Change | 0 | 15 | 0 | 0 | 0 | 0 | 0 | 20 | 0.583333333333333 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: For about 4h the MCC was trying to fix the problem of the beam trips caused by the BCM. Eventually, the beam became stable, at least at low currents.
Data Entry by: E.Chudakov