• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:03:04 on June 14, 2001

    Entry number 63047

    keyword=Beam Time Accounting
    Hall A

    6/14/2001 0000-0800
    Experiment #: e99117
    Shift Leader: R.Michaels
    Shift Workers: E.Chudakov, A.Camsonne

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    5 0 0 0 15 45 30 40 2.25
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 20 0.333333333333333
    Beam Not Available
    or Unacceptable
    55 45 60 60 45 15 30 0 5.16666666666667
    Accelerator Con-
    figuration Chage
    0 15 0 0 0 0 0 0 0.25
    Experiment
    Ready
    1 45 1 1 1 1 1 40 7.41666666666667
    Planned Config-
    uration Change
    0 15 0 0 0 0 0 20 0.583333333333333
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: For about 4h the MCC was trying to fix the problem of the beam trips caused by the BCM. Eventually, the beam became stable, at least at low currents.

    Data Entry by: E.Chudakov