6/13/01 Swing shift Summary:
16:00 beam turning
16:35- 18:05
beam back, with tuning beam, centered beam on BeO target (-2.5,0). Did a
HARP scan.
Checked raster. Parity DAQ not working, We took out sync for now.
Did EPR while centering beam (37%).
Did NMR after raster check.
18:05 polarized He3 target in position, waiting for beam.
18:15 MCC called that they have problem with BCMs, will take some time.
19:45 Beam back, after raster check, started production data taking at x=0.61
(pol. He3 at 0 degree).
21:00 it had a lot of trips (due to BCMs?) and MCC is still invetigating.
Bob Michaels came fixed the HAPPEX DAQ.
22:30-22:50 EPR 29%.
22:55 Turned off laser 4, only 3 lasers now.
24:00 Have been taking production data all the time. A lot of beam trips.