Main INDEX
Monthly INDEX
PREV
NEXT
User name ddutta
Log entry time 23:53:05 on June15,2001
Entry number 63307
keyword=Shift Summary
4:21 EPR(37%)
16:44 end run 1581/20581
16:47 start run 1582/20582 10 muA on He3, longitudinal,0 deg, half wave plate OUT.
17:47 end run 1582/20582
17:49 start run 1583/20583 10 muA on He3
18:31 MCC calls to say there is some problem with the PSS,
beam may be down for 1 hr.
18:31 stopped run 1583/20583
19:20 Beam back, we do quick check with BeO target (run 1584/20584)
19:27 Start run 1585/20585 10 muA on He3.
20:29 stop run 1585/20585
20:30 NMR(Failed) Beam off because of RF trips.
20:45 EPR(36.5)
21:00 NMR(failed)
22:30 Reference cell put in, 110 psig of He3
23:40 Beam back, check raster, start run 1586/20586 with 1muA
23:42 back to 10 muA on reference cell
23:50 current reduced to 5 muA