    User name ddutta

    Log entry time 23:53:05 on June15,2001

    Entry number 63307

    keyword=Shift Summary

    4:21 EPR(37%)
    16:44 end run 1581/20581
    16:47 start run 1582/20582 10 muA on He3, longitudinal,0 deg, half wave plate OUT.
    17:47 end run 1582/20582
    17:49 start run 1583/20583 10 muA on He3
    18:31 MCC calls to say there is some problem with the PSS,
    beam may be down for 1 hr.
    18:31 stopped run 1583/20583
    19:20 Beam back, we do quick check with BeO target (run 1584/20584)
    19:27 Start run 1585/20585 10 muA on He3.
    20:29 stop run 1585/20585
    20:30 NMR(Failed) Beam off because of RF trips.
    20:45 EPR(36.5)
    21:00 NMR(failed)
    22:30 Reference cell put in, 110 psig of He3
    23:40 Beam back, check raster, start run 1586/20586 with 1muA
    23:42 back to 10 muA on reference cell
    23:50 current reduced to 5 muA