• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Sirca

    Log entry time 15:58:40 on June17,2001

    Entry number 63572

    keyword=Summary of day shift

    08:00 -- Continuing production runs at 10 muA with P=37.3% (EPR) and P=34.2%
    (NMR) measured at around 7am. Problems with charge asymmetry reported from
    the previous shift, will try to figure out what is going on. (See halog
    entry 63470 et seq., and the conclusions in 63559.)

    Run# Start/Stop Events* Comments
    ---------------------------------------------------------------------------
    1616 07:27/08:27 550 ok, production
    1617 08:31/09:31 610 ok, production
    1618 09:34/10:34 580 ok, production
    1619 10:37/11:04 290 ok, production
    11:04 chg beam lam/2 -110ppm -> +350ppm in cntrl
    since the asymmetry was way off
    1620 11:07/12:08 590 ok, production, performed EPR during this run
    12:09 P=37.2% (EPR)
    1621 12:10/13:09 620 ok, production
    13:11 shift qasy control by +100ppm
    1622 13:12/13:17 junk, beam off
    13:17/13:35 beam off, MCC need to look into trim lock
    1623 13:38/14:40 590 ok, production
    qasy control is now set at 0ppm and seems OK
    1624 14:43/15:43 590 ok, production
    1625 15:45/----> run passed on to the evening shift
    ---------------------------------------------------------------------------

    (*) Rough estimate using T3[0]*0.6%, which is the fraction of T3[0]
    counts surviving the Cerenkov ADC, zreact and (pre)shower cuts in the
    left arm according to Xiaochao. The rate of useful events is then
    approx. 540 per hour of running with 10 muA.