16:00 -- Continuing production runs with P=37.1%(EPR) measured at 11:20 am.
At 17:49 beam was turned off to perform an EPR measurement and change the field orientation from 0 to 180 degrees. The target half-wave plate was moved IN. Beam was restored at 18:15. The results of the EPR measurement showed P=36% (originally believed to be 38%, but was found to be lower on further analysis).
Antonin Vacheret came in to work on the parity DAQ. He found problems with the triggering, so since 1626/20626 we are now running without the parity DAQ (see HALOG 63586).
Charge asymmetry looked good at the start of shift, but at run 20627 the charge asymmetry suddenly jumped up to 234 ppm. It took several runs for this value to stabilize once again near 90. A second EPR measurement was performed at 21:40, with P=35.3%. Beam was excellent until 22:45, when we were plagued with trips for nearly an hour.
Run# Start/Stop #Events Comments
-------------------------------------------------------
1625 15:45/16:43 153125 Production 0 degrees, target half wave OUT
1626 16:45/17:45 154361 Same as previous... Parity DAQ does not reflect run
**** EPR performed at 17:50 P=36%
Field orientation- 180 degrees, target half wave IN
1627 18:17/19:18 164060
1628 19:20/20:20 133045 Charge Asym -234 ppm
1629 20:22/21:21 153732 Charge Asym -280 ppm
1630 21:26/22:25 150914 Charge Asym -134 ppm EPR performed P=35.3%
1631 22:33/23:35 142354 Charge Asym +92 ppm (error of 76 ppm)
1632 23:47 ------------Passed to next shift