Main INDEX
Monthly INDEX
PREV
NEXT
User name S. Sirca
Log entry time 19:02:02 on June18,2001
Entry number 63708
keyword=Temporary change of run-plan
Beam is available, the NMR measurement was done, but the target crew is
struggling to get the EPR measurement done. We are presently in the longitudinal
mode with beam half-wave IN, target half-wave OUT. Until the EPR
attempts on the physics cell bear fruit, we will measure with the reference cell
with N2.