• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Sirca

    Log entry time 19:02:02 on June18,2001

    Entry number 63708

    keyword=Temporary change of run-plan

    Beam is available, the NMR measurement was done, but the target crew is
    struggling to get the EPR measurement done. We are presently in the longitudinal
    mode with beam half-wave IN, target half-wave OUT. Until the EPR
    attempts on the physics cell bear fruit, we will measure with the reference cell
    with N2.