1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 0 | 30 | 45 | 1 | 45 | 25 | 3.41666666666667 |
Beam Available but Not in Use | 0 | 0 | 30 | 30 | 15 | 0 | 15 | 35 | 2.08333333333333 |
Beam Not Available or Unacceptable | 1 | 1 | 30 | 0 | 0 | 0 | 0 | 0 | 2.5 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 30 | 30 | 45 | 1 | 45 | 45 | 6.25 |
Planned Config- uration Change | 0 | 0 | 15 | 15 | 15 | 0 | 15 | 15 | 1.25 |
Unplanned Experiment Down | 0 | 0 | 15 | 15 | 0 | 0 | 0 | 0 | 0.5 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: A lot of target polarisation measurements and holding field rotations. Some depolarisation observed after work in the hall was complete and the first NMR and EPR were done. Polarisation now slowly recovering.
Data Entry by: Simon Sirca