    User name S. Sirca

    Log entry time 23:56:38 on June18,2001

    Entry number 63727

    keyword=Summary of evening shift


    Run# Start/Stop Comments
    -------------------------------------------------------------------------------
    16:00 Target crew in Hall changing winding of transverse coils
    17:00/19:00 Perform NMR, trying hard to do EPR as well
    19:00 EPR done, P=25%
    19:00 Get beam on BeO, check size, insert reference cell
    1645 19:16/ start reference-cell run
    during run, tg half-wave to OUT, holding field to 180
    /19:44 end of reference-cell run
    19:45/20:00 with holding field at 180, do NMR, EPR
    20:00 P is approx. 26%. Go to ref. cell once more while
    physics cell is being pumped transversely
    1646 20:09/20:59 reference-cell run
    21:00/22:45 Moller measurement, physics cell pumped at 180
    22:50/23:05 EPR measurement, P=27.0,27.5%
    23:05 holding field to 270
    23:15 check spot size with 1 muA, resume transverse production
    1647 23:16/ ok, production
    -------------------------------------------------------------------------------