Main INDEX
Monthly INDEX
PREV
NEXT
User name kramerk
Log entry time 01:10:15 on June20,2001
Entry number 63823
keyword=Checked Beam Spot
MCC sent 1uA CW beam to Hall A @ 12:38am. We looked at the unrastered beam on the BeOand found that it was about a millimeter off in the x direction (-3.5,0) so I asked them to move it to (-2.5,0). BPM A now reads (-2.341,0.016) and BPM B reads (-2.875,0.102). Beam looked good on Be).
We checked the raster and it was even distributed and a good size.
Moved the target back into Pol. 3He position.