    shift summary
    1600:-17:30 controlled access to install 1/2 wave plates
    17:35 - beam permit
    17:55 start run 678 at 9.1 uA
    19:00 end run 678 T1=495, T3=556
    19:16 start run 680
    20:25 end run 680, T1=595, T3=683, Sum1=1090, Sum2=1239
    20:27 start 681
    21:18 end run 681, T1=332, T3=428, Sum1=1422, Sum2=1667
    21:41 start run 682
    22:55 end run 682, T1=645, T3=697, Sum1=2067, Sum2=2364
    22:55 start run 683,
    23:38 end run 683, T1=345, T3=385, Sum1=2412, Sum2=2749
    23:40 change beam polarization, lambda plate is out, target at 0 deg.
    target half wave plate is out- also asked MCC to change the charge asymmetry feedback for the wave plate plate out configuration.
    23:45 start run 684