• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Sulkosky

    Log entry time 11:09:03 on June21,2001

    Entry number 64012

    keyword=Checked beam spot

    MCC sent 3 muA of CW beam to Hall A at 10:55 am. We looked at raster beam on the BeO and found that the position looked good. BPM A now reads (-2.236,0.199) and BPM B reads (-2.536,0.330).

    Raster was checked and was even distributed and good size.

    Moved target back to Pol 3He