Main INDEX
Monthly INDEX
PREV
NEXT
User name Sulkosky
Log entry time 11:09:03 on June21,2001
Entry number 64012
keyword=Checked beam spot
MCC sent 3 muA of CW beam to Hall A at 10:55 am. We looked at raster beam on the BeO and found that the position looked good. BPM A now reads (-2.236,0.199) and BPM B reads (-2.536,0.330).
Raster was checked and was even distributed and good size.
Moved target back to Pol 3He