• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name K. McCormick

    Log entry time 23:54:33 on June21,2001

    Entry number 64076

    keyword=Swing Summary June 21

    4-5: Waiting for beam
    5:05: Beam back, checked spot on BeO. Looks good, we're switching to Pol 3He.
    5:19: Run 1700. Found that the right arm was on run 20699 and that the
    charge asymmetry didn't seem to be calculated correctly, so we stopped runs.
    5:37: Run 1701, 20701 started.
    6:00: Saw charge asymmetry was around -380, so adjusted it. It's now around -100.
    6:30: Run 1702, 20702 started.
    7:00: Bob Michaels enables automatic charge feedback during run 1702, 20702
    7:15: Beam off due to magnet trip in accelerator
    7:38: Beam back. Start run 1703,20703.
    8:20: Beam off because of magnet trip. At 8:30 the MCC tells us that they are going
    to backflush the magnet, which will take ~1 hour.
    9:30: Xiaochao in to do an EPR measurement. We did an NMR before that.
    11:40: Beam back. Start run 1704,20704.