    Log entry time 23:54:41 on June 21, 2001

    Entry number 64077

    keyword=Beam Time Accounting
    Hall A

    6/21/2001 1600-2400
    Experiment #: e99117
    Shift Leader: K. McCormick
    Shift Workers: S. Frullani, J. Roche

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 55 1 40 20 0 0 20 3.25
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    1 5 0 20 40 1 1 40 4.75
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 4-5: Waiting for beam. 5:05: Beam back. Check spot on BeO. Change to He3. 5:19: Start Run 1700. 5:37: Run 1701,20701 6:30: Run 1702,20702. End run at 7:15 because of magnet trip in Acc. 7:40: Beam back. 8:20 Magnet trips ago in Accelerator. Beam off. 8:30: MCC is going to backflush the magnet that's giving them trouble. Since the machine is down, we did an NMR measurement. 9:30: Xiaochao came in and did an EPR measurement. 11:40: Beam back. Start run 1704,20704.

    Data Entry by: K. McCormick