1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 55 | 1 | 40 | 20 | 0 | 0 | 20 | 3.25 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 1 | 5 | 0 | 20 | 40 | 1 | 1 | 40 | 4.75 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 4-5: Waiting for beam. 5:05: Beam back. Check spot on BeO. Change to He3. 5:19: Start Run 1700. 5:37: Run 1701,20701 6:30: Run 1702,20702. End run at 7:15 because of magnet trip in Acc. 7:40: Beam back. 8:20 Magnet trips ago in Accelerator. Beam off. 8:30: MCC is going to backflush the magnet that's giving them trouble. Since the machine is down, we did an NMR measurement. 9:30: Xiaochao came in and did an EPR measurement. 11:40: Beam back. Start run 1704,20704.
Data Entry by: K. McCormick