User name Aniol
Log entry time 16:50:43 on June22,2001
Entry number 64152
keyword=chopper slit
16:45 - MCC says that the injector group is trying to get the Hall A chopper slits back to working condition. The Hall C slits we have been using have failed in the same way that the Hall A slit failed earlier in the run. The injector people eztimate it will take 1/2 hr to get the injector working - then there is about another 1/2 hr to get the beam through the accelerator.