    16:00 beam has been off since 14:50
    16:45 - mcc says injector people are trying to start hall A chopper slits. Hall C chopper slits have the same problems as earlier problem with hall A slits. They estimate 1/2hr of injector work and hen 1/2 hr of accelerator work to bring beam back to hall - earliest time for beam is 17:45
    18:05 - beam back, BeO looks ok, spot++ = 4mm dia.
    18:18 - beam is not back, mcc says there is a cavity problem.
    18:25 beam back


    180 deg config., beam lambda/2 = out, target lambda/2 = in
    runs 715+716 sum1 = 909, sum2 = 1029
    18:27 start run 1719
    19:31 end run 719 T1= 538, sum1 =1447, T2 =604, sum2 =1633
    19:32 start run 720
    20:36 end run 720 T1=523, sum1 = 1970, T2=577, sum2 = 2210
    20:48 start run 721
    21:52 end run 721 T1=551, sum1 = 2521, T2=587, sum2=2797
    21:52 start run 722
    22:54 end run 722 T1=559, sum1= 3080, T2=578, sum2=3375
    22:55 start run 723
    23:58 end run 723 T1=488, sum1 = 3568, T2=600, sum2 = 3975