1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 55 | 55.0 | 55.0 | 50.0 | 50.0 | 55.0 | 55.0 | 45.0 | 7 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 10.0 | 0 | 0 | 15.0 | 0.416666666666667 |
Beam Not Available or Unacceptable | 5 | 5.0 | 5.0 | 10.0 | 0 | 5.0 | 5.0 | 0 | 0.583333333333333 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 50.0 | 1 | 1 | 1 | 7.83333333333333 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 10.0 | 0 | 0 | 0 | 0.166666666666667 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Parity run DAQ crashed twice. Reboot adaqcp, data taking continued. Lost a total of ~30min due to the DAQ down time. Other than that, a productive shift.
Data Entry by: Hong Xiang