    User name adaq

    Log entry time 23:57:37 on June 24, 2001

    Entry number 64473

    keyword=Beam Time Accounting
    Hall A

    6/24/2001 1600-2400
    Experiment #: e99117
    Shift Leader: Hong Xiang
    Shift Workers: David Armstrong, Xiaofeng Zhu

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    55 55.0 55.0 50.0 50.0 55.0 55.0 45.0 7
    Beam Available
    but Not in Use
    0 0 0 0 10.0 0 0 15.0 0.416666666666667
    Beam Not Available
    or Unacceptable
    5 5.0 5.0 10.0 0 5.0 5.0 0 0.583333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 50.0 1 1 1 7.83333333333333
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 10.0 0 0 00.166666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Parity run DAQ crashed twice. Reboot adaqcp, data taking continued. Lost a total of ~30min due to the DAQ down time. Other than that, a productive shift.

    Data Entry by: Hong Xiang