Log entry time 09:43:04 on June26,2001
Entry number 64666
keyword=Target survey starts, lasers off/locked out, oven off, ari flow off, Cooling jet He flow off
7:55 turned off all lasers and have the laser keys locked out to get
ready for opening up the scattering chamber for target survey.
8:20 turned off oven (both upstairs (set temperatur to 20 C) and down stair
heaters), after temperature cooled down to below 30 C, turned off air flow
so that Ed's people can work on the air compressor.
8:20 turned off the Helium Cool Jet flow.
8:30 With Radcon coverage, opened up the scattering chamber. Put in the survey
targets. Radcon did swipe inside the scattering chamber and found it was clean
(no contamination).
Survey starts. Target in Pol. He3 position.