Main INDEX
Monthly INDEX
PREV
NEXT
User name Armstrong
Log entry time 19:18:37 on June26,2001
Entry number 64701
keyword=check spot/position with BeO
- MCC delivers pulsed beam, then 2 muA CW beam to BeO target.
Spot looks good (raster on).
- We ask them to move to -1.5 mm and 0 mm (x,y) based on today's
survey results, and they do so.
- move to empty target measurement so Arun can do the ARC energy
measurement...; continue to pump with longitudinal lasers...