• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Reitz

    Log entry time 00:00:20 on June27,2001

    Entry number 64711

    keyword=swing shift summary

    16:00 Hall is in restricted access
    16:45 sweep of Hall A starts
    18:45 Moved target to BeO, changed holding field to 0deg, Laser longitudinal
    19:15 beam on BeO, 1.5 uA, Raster on, Position -1.5 / 0.0 mm/mm
    20:00 beam back, A.Saha is doing ARC energy measurement
    20:30 MCC calls, a cavity tripped, will take some time
    since target pol. is at 31%, ARC energy measurement is cancelled for
    today
    23:35 beam back, starting epr measurement