Main INDEX
Monthly INDEX
PREV
NEXT
User name M. Rvachev
Log entry time 08:00:23 on June27,2001
Entry number 64754
keyword=Shift summary
0:00 EPR/NMR measurements and holding field rotation are being performed.
0:12 Holding field rotated to 270 deg. BeO spot check was done in the end
of last shift, target in polarized 3He position, requesting beam.
0:15 Beam in the hall, starting running in in/+ x=0.6 configuration.
Fast feedback is on on position (absolute mode) and energy.
0:30-0:50 MCC has trouble with an RF zone, no beam.
1:36-2:04 MCC has problems with slit in injector, no beam.
3:58-4:32 MCC has trouble with an RF cavity, no beam.
4:03 Starting EPR measurement while MCC is recovering cavity.
4:30 EPR polarization measurement by Xiaofeng: 35.8%
4:41 Back to taking data.
6:40-7:16 Problems in injector, no beam.
8:00 Next crew takes over.
Run summary:
Lrun#..Rrun#..Parity_run#..Start.........End.....Comments
1804....20804........981..........00:14........00:32.....good, 6 minutes of beam
1805....20805........982..........00:50........01:38.....good
1806....20806........983..........02:04........03:04.....good
1807....20807........984..........03:06........03:58.....good
1808....20808........985..........04:41........05:44.....good
1809....20809........986..........05:46........06:44.....good
1810....20810........987..........07:16....continued on next shift