Main INDEX
Monthly INDEX
PREV
NEXT
User name J. Roche
Log entry time 00:00:39 on June30,2001
Entry number 65039
keyword=Shift Summary
17:55 -> beam is back :
1/2wp beam on (starting now)
beam position ok, raster on, fast feed back working
target status :
field dir = 180deg
laser conf long
1/2 wp in
grad coil l=-2.00A, T=5.00 A
17:56->EPR measurement (37.5%)
18:00 -> 21:00 production, the beam charge assymetry is large and we don't succeed to bring it low. After a while we determine that the rotatable waveplate seems not to move (read back stucked at 599). MCC will call the injector expert.
21:00 -> Joe Grames comes and fix the trouble with the feedback on the charge assymetry (see entry # 65023)
runs taken during this shift : 847 -> 854
status : number of electrons at the end of runs 853
21969 on left arm
20107 on right arm