Main INDEX
Monthly INDEX
PREV
NEXT
User name X. Zheng
Log entry time 11:01:29 on July 1,2001
Entry number 65261
keyword=Target - EPR - 37.6%
10:51am, EPR with beam off, laser #6 on.
target position: pol 3he cell
1st order fit:
down: freq. shift = -45.23 KHz +/- 1.55 KHz, P = -37.56%+/- 1.29%
up: freq. shift = 44.06 KHz +/- 1.59 KHz, P = 36.59%+/- 1.32%
0th order fit:
down: freq. shift = -45.35 KHz +/- 1.57 KHz, P = -37.66%+/- 1.30%
up: freq. shift = 44.79 KHz +/- 1.61 KHz, P = 37.20%+/- 1.34%
Before measurment I lowered rel gain and abs. gain by about 0.1 turn, which should
fix the problem Kevin had this morning. During measurment I found the sweep is quite slow so in the end I change the abs. gain back. The current setting (low rel. gain) can keep the noise level low but it may cause sweeps to fail.