0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 34 | 30 | 49 | 45 | 38 | 46 | 53 | 53 | 5.8 |
Beam Available but Not in Use | 12 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.2 |
Beam Not Available or Unacceptable | 14 | 30 | 11 | 15 | 22 | 14 | 7 | 7 | 2 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 12 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.2 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 8:38. Ask MCC to turn off the beam in order to perform a target polarimetry (NMR). 8:50. Ask for the beam back 8:55 Beam is still down due to cavity problem. 9:30 Beam is back. We resume data taking. 12:55 Beam is down 13:10. Beam is back. 2:10. EPR measurement. 2:25. Ask for the beam back at 12 uA.
Data Entry by: A. Deur