• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name X. Zheng

    Log entry time 13:12:47 on July 3,2001

    Entry number 65598

    keyword=Target - EPR - 38.2%

    12:51pm, EPR, with laser #6, beam off
    target position: Empty
    gradient coil current: T=5.00A, L=-2.00A

    1st order fit:
    down: freq. shift = -45.95 KHz +/- 3.29 KHz, P = -38.16%+/- 2.73%
    up: freq. shift = 45.81 KHz +/- 4.05 KHz, P = 38.05%+/- 3.36%

    0th order fit:
    down: freq. shift = -44.79 KHz +/- 3.28 KHz, P = -37.20%+/- 2.72%
    up: freq. shift = 45.85 KHz +/- 4.06 KHz, P = 38.08%+/- 3.37%

    At the beginning I tried to use 3 lasers for temperature test but did not succeed.
    Finally I went back to 1 laser configuration.
    I took 1st order fit of up flip in title.