• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 17:03:15 on July 5,2001

    Entry number 65632

    keyword=New 25 cm cell Tilghman is installed.

    We (Kevin, Kathy and JP) took out the target ladder and
    installed the new 25 cm cell Tilghman. Get ready to do spin-up
    to get the maximum polarization. Air flow is back on. Oven is being heated
    up. Laser keys are back in position.