Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen/K. Kramer
Log entry time 17:52:52 on July11,2001
Entry number 65789
keyword=Tilghman installed
Duke was taken out this morning and Tilghman was installed with the new ladder
which was the one being surveyed last week. (Note: At the time of survey, some of the pins fixing the top with the sides were and on the sides with the bottom were
not in). Tilghman (25 cm, about 44% polarization) is the target to be used for
beam for the next running period (July 13-July 31).