Main INDEX
Monthly INDEX
PREV
NEXT
User name Jiang, Chudakov
Log entry time 11:48:34 on July12,2001
Entry number 65830
keyword=install PMT base on left-arm pion-rejector layer-two block -16 and -17.
Access to the left-arm detector hut, install PMT base on the lead-glass layer-two
left block-16 and 17. The base -17 was repaired. Set HV, block-16 to be 1968 (the same as before) and block-17 to be 1446 (the same as it was before June 20)
strat cosmic ray run 1975.