Main INDEX
Monthly INDEX
PREV
NEXT
User name slifer
Log entry time 07:50:59 on July13,2001
Entry number 65933
keyword=shift summary
01:00 Beam back to hall.
began with carbon/BEO runs.
02:20 He-3 target for positron data
The VDC threshold was set to 0. So all runs before 1983/20983
are junk. Also, prior to run 1983 Nilanga was making software
modifications. As a result we could not analyze the right arm
runs.
04:20 NMR 48.2%
04:25 Began to cycle magnets for spectrometer change to 1.72 GeV
04:35 Beam back
05:05 Magnets stabalized. Began data taking at 1.72 GeV
05:15 RF cavity Trip. Beam down
05:20 Pedestal Run.
05:20 EPR 48.1%
05:30 MCC sends "tuned" beam to Hall at 5uA
05:40 CW Beam Back. Taking positron data at 1.72 GeV.
Frequent beam down.
Everything we checked looks o.k. to return to production.
Noticed shift of scintillator ADC peaks (both arms) and
Cerenkov PMT #2 and 4 (right arm).