Main INDEX
Monthly INDEX
PREV
NEXT
User name Calarco
Log entry time 15:59:50 on July13,2001
Entry number 65959
keyword=Shift Summary
Day shift 7/13/01: Calarco (SL), Korsch (TO), Savvinov
.
8:05 Ended run 1990 with 1.1M events
8:09 Started run 1992 after aborting 1991
8:29 Ended run 1992 with 0.25M events; Eugene in to do Moeller; started ramping
the magnets down.
11:00 Moeller measurement complete (measured 83%); hall access to change polarity
11:00 Access also used to open 3He bottle; reattached TC to oven heater
12:00 Polarity change complete; ramping magnets back up
13:00 Analysis of target polarization gives 48.8%; Arun waiting for beam to do arc
measurement.
14:20 Beam energy measurement completed (E = 5.727 +/- 0.003); magnets ready
14:25 Ready to do charge asymmetry
15:00 Started charge asymmetry measurement
15:20 MCC taking beam for some repairs
16:00 Shift ends on this note