• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Kelly

    Log entry time 15:54:44 on July22,2001

    Entry number 67124

    keyword=day shift summary

    0810: found ROC15 hung during run 21178. Runend failed. Shutdown and restarted runcontrol on all DAQs.
    1100: target polarization NMR=42.8%, EPR=43.0%
    1112: resume production
    1230: erratic beam for last half hour
    .
    .
    configuration: target halfwave plate in, holding field 180, beam halfwave plate in
    statistics: start with 91.2k in bank.
    .
    runs...................left....right......total
    2178/21178....2527......987......94.7k
    2179/21179....5317....5260....105.3k
    2180/21180....3421....3265....112.0k
    2181/21181....4939....4472....121.4k
    2182/21182....5052....4763....131.2k
    2183/21183....2176....2024....135.4k
    .
    1506: TAKE BEAM HALFWAVE PLATE OUT and change sign of slope for
    rotatable waveplate in helicity feedback controls.
    15:10: start run 2184.