• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 15:57:11 on July 23, 2001

    Entry number 67275

    keyword=Beam Time Accounting
    Hall A

    7/23/2001 0800-1600
    Experiment #: e99117
    Shift Leader: J. P. Chen
    Shift Workers: W. Korsch, , U.

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    45 6 0 0 0 0 20 0 1.18333333333333
    Beam Available
    but Not in Use
    10 0 0 0 30 30 0 0 1.16666666666667
    Beam Not Available
    or Unacceptable
    5 0 0 0 0 0 20 1 1.41666666666667
    Accelerator Con-
    figuration Chage
    0 54 1 1 30 30 20 0 4.23333333333333
    Experiment
    Ready
    50 1 1 1 30 30 1 1 6.83333333333333
    Planned Config-
    uration Change
    0 0 0 0 30 30 0 0 1
    Unplanned
    Experiment Down
    10 0 0 0 0 0 0 00.166666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 10 0 0 0 0 0 0 0 0.166666666666667
    Other 0 0 0 0 0 0 0 0 0

    Comments: Beam from 8-9 then ACC configuration change. We accessed to study helicity asymmetry and also took pulser runs. At 14:00 beam back, but unstable. Then beam off for Hall C tuning RF separator. At the end of the shift, MCC is trying to tuning beam back to us.

    Data Entry by: J. P. Chen