    Log entry time 00:13:38 on July 26, 2001

    Entry number 67622

    keyword=Beam Time Accounting
    Hall A

    7/25/2001 1600-2400
    Experiment #: e99117
    Shift Leader: A. Deur
    Shift Workers: JP Chen , W. Hinton

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    54.4 11.9 0 0 7.2 54.6 19.2 35.4 3.045
    Beam Available
    but Not in Use
    0 48.1 1 1 52.8 0 0 0 3.68166666666667
    Beam Not Available
    or Unacceptable
    5.6 0 0 0 0 5.4 40.8 24.6 1.27333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 5:20 We asked for the beam to be turned off (tour in the hall). Bodo and Bob Micheal took the chance to access the detector. Jian-Ping worked on the laser alignment. 20:50 Beam is restored 10:45 A cavity keeps tripping -> beam is turned off to fix the problem. 23:20. Beam is back (problem desapeared). 24:00. Asked for beam 1/2 wave plate to be put in (we are done with the data taking on c12, toggle mode, beam 1/2 wave plate out: about 26 M event)

    Data Entry by: A. Deur