Main INDEX
Monthly INDEX
PREV
NEXT
User name xfzhu
Log entry time 07:56:36 on July29,2001
Entry number 68184
keyword=shift summary
From run 2361, the #9 PMT of left arm GC becomes noisy.
Run# (2362/21362) Events # (3350/3282)
1:00am, turn on the charge asymmetry auto feedback.
Run# (2363/21363) Events # (3640/3462)
Run# (2364/21364) Events # (3750/3539)
Run# (2365/21365) Events # (5508/5343)
3:49am, NMR: 35.7%
4:12am, EPR: 36.9%
Change the configration of the spectrometer: from 35 degree to 45 degree. The central momentum changed from 1.72GeV/c to 1.455GeV/c.
4:30am Do the Moller measurement for the beam polarization--82%.
6:31am, NMR : 39.1%
6:40am, EPR : 39.2%
7:25am, start data taking for X=0.61, in the long. mode (0 degree), with beam half wave plate out, and target half wave plate out. Toggle mode.
The 1st Run#'s for this configration are 2366/21366.