    User name J. Roche

    Log entry time 00:05:36 on July30,2001

    Entry number 68271

    keyword=shift summary

    target -> longitudinal (0deg)
    1/2 wp out
    beam -> 1/2 wp out
    toggle
    I=15 micro amp
    x=0.61

    ******************************************************

    16:45 lost connection with adaqcp
    17:25 recover from coda crashed
    run *374,*375,*376,*377 are junk

    18:45 stop data taking for target polarization measurements
    epr and nmr 40.5% (same result)

    23:50 while waiting for beam, target polarization measurement.

    *******************************************************

    statistic :
    in average for this shift 1.3 k on both spectrometers

    at the end of this shift
    8594 e- accumulated by left arm spectrometer
    8617 by right one
    total 17211.
    the goal for this point is 20 k so 2-3 hours to go

    ********************************************************

    Electron spectrometer (r or l ?) -> Nitrogen level for q2 and dipole are lower than expected : q2 21 % and d 15 % where shift list ask them to be larger than 25 %. trouble already reported on previous check list. X. Jiang suggests that
    next shifters should keep one eye on those levels and call the technician on call if the levels drop to a few %.