Log entry time 00:05:36 on July30,2001
Entry number 68271
keyword=shift summary
target -> longitudinal (0deg)
1/2 wp out
beam -> 1/2 wp out
toggle
I=15 micro amp
x=0.61
******************************************************
16:45 lost connection with adaqcp
17:25 recover from coda crashed
run *374,*375,*376,*377 are junk
18:45 stop data taking for target polarization measurements
epr and nmr 40.5% (same result)
23:50 while waiting for beam, target polarization measurement.
*******************************************************
statistic :
in average for this shift 1.3 k on both spectrometers
at the end of this shift
8594 e- accumulated by left arm spectrometer
8617 by right one
total 17211.
the goal for this point is 20 k so 2-3 hours to go
********************************************************
Electron spectrometer (r or l ?) -> Nitrogen level for q2 and dipole are lower than expected : q2 21 % and d 15 % where shift list ask them to be larger than 25 %. trouble already reported on previous check list. X. Jiang suggests that
next shifters should keep one eye on those levels and call the technician on call if the levels drop to a few %.