7/30/01 day shift summary:
Shift workers: J. P. Chen, P. Zolnierczuk, N. Savvinov
X=0.61, beam half wave plate in, helicity toggle mode. target at 0 degree. target halfwave plate out. beam current is 15 uA.
left # of good e right # of good e
Run 2391 199 21391 193
Run 2392 309 21392 264
Run 2393 741 21393 738
Helicity position test from 10 am-11 am De-coupled Parity DAQ from Spectrometer
DAQs. for the runs 2394/21394. The position change at the target BPM is
only 1 micron (but FF was on!). The charge asymmetry with parity DAQ
(from Bob) was 1700 ppm in x (5 minutes) and small in y.
Run 2394 741 21394 632
11 am The helicity position test completed. Parity DAQ is back in sync with spectrometer DAQs.
Run 2395 975 21395 905
12:30 Polarization measurements
NMR=41.2%, EPR=42.4%.
Run 2396 661 21396 603
Run 2397 972 21397 829
Total at this configuration is 14.6K. Goal is 20K.
At about 15:45, found adaql3 could not analyze data!