User name A. Deur
Log entry time 17:50:35 on August 1,2001
Entry number 68567
keyword=eP
eP is ready and setup for the measurement at 1198 MeV.
I had to reboot hallasc15 (eP DAQ) and hallasc6 (detectors and target).
Also Ed and I opened the target chamber because there was no readout from the target. It turns out that the two readout diodes were dead but the target was intact. We replaced both the target and the diodes.
We also noticed that the beam has hit one of the stainless steel piece of the target mechanism: There was a black and brown spot. Ed does not recall that it was here at the previous target change. Radcon, Kees and Arun are aware.