Main INDEX
Monthly INDEX
PREV
NEXT
User name a-onl
Log entry time 15:24:25 on August 4, 2001
Entry number 69167
keyword=Start_Run_21565,Run_type=elastic,beam_energy=1196.9,beam_halfwaveplate=out,beam_polarization=82.0,beam_raster=on,comment_text=He3,daq_mode=both HRS daq,leftarm_p=1195,leftarm_theta=18.6,rightarm_p=1195,rightarm_theta=18.6,target_halfwaveplate=out,target_name=Shapiro,target_polarization=48,target_type=Reference Cell Empty
Beginning-of-run EPICS data for Run Number 21565 at Sat Aug 4 15:24:09 EDT 2001
; RIGHT SPECTROMETER
; (Integer!) prescale factors for runs.
; This file is read at start of every run.
; Do NOT put spaces in string, NOR add 2nd string.
; The default factor is essentially infinite.
; ps8 = 65535 turns off the 1 kHz pulser on T8.
; Keep enough T2 to measure efficiency
;
ps1=2,ps2=1,ps8=65535
Right Arm Q1 power supply current : 898.485
Right Arm Q1 momentum : 1.1949
Right Arm Q1 gauss meter : -0.02243
Right Arm Q1 power supply polarity : 0
Right Arm Q2 power supply current : 514.133
Right Arm Q2 momentum : 1.19464
Right Arm Q2 gauss meter : 0.2703
Right Arm Q2 power supply polarity : 0
Right Arm D1 power supply current : 409.18
Right Arm D1 momentum : 1.195
Right Arm D1 NMR : 0.44345
Right Arm Q3 power supply current : 475.318
Right Arm Q3 momentum : 1.19454
Right Arm Q3 gauss meter : 0.213
Right Arm Q3 power supply polarity : 1
Left Arm Q1 power supply current : 899.08
Left Arm Q1 momentum : 1.19506
Left Arm Q1 gauss meter : -0.07604
Left Arm Q1 power supply polarity : 0
Left Arm Q2 power supply current : 514.506
Left Arm Q2 momentum : 1.19486
Left Arm Q2 gauss meter : 0.2718
Left Arm Q2 power supply polarity : 1
Left Arm D1 power supply current : 399.094
Left Arm D1 momentum : 1.195
Left Arm D1 NMR : 0.442369
Left Arm Q3 power supply current : 475.737
Left Arm Q3 momentum : 1.19496
Left Arm Q3 gauss meter : -0.2376
Left Arm Q3 power supply polarity : 1
Average current of the two cavities : 9.3374
Current on Unser monitor : 14.3995
Current on Upstream bcm : 9.32228
Current on Downstream bcm : 9.42696
Upstream Cavity Coefficient : 76.7
Downstream Cavity Coefficient : 78.1
Current on IBC0L02 (source) :
Beam energy : 1197.93
MBSY1c magnet current (amp) : 49.6474
Radiator 5V Linear Supply : 0.002442
Radiator Encoder : 0
Right Arm Arm Collimator : 0.865381
Left Arm Arm Collimator : 0.868457
HacR_HPE1313A:0_Ch58 : -0.524902
HacR_HPE1313A:0_Ch55 : 23.0469
HacR_HPE1313A:0_Ch54 : -0.820801
HacR_alignROLL : -0.290658
HacR_alignPITCH : 0.0621147
HacR_alignHPT : -0
HacL_HPE1313A:0_Ch58 : -0.154297
HacL_HPE1313A:0_Ch55 : 24.707
HacL_HPE1313A:0_Ch54 : -0.0976562
HacL_alignROLL : 0.0970543
HacL_alignPITCH : 0.135608
HacL_alignHPT : -0
Right Arm Angle Floor Angle : 18.5
Right Arm Angle Vernier : -16.8
Right Arm Scattering Angle : 18.6001
Left Arm Angle Floor Angle : 18.5
Left Arm Angle Vernier : 48.4
Left Arm Scattering Angle : 18.6033
Wien angle :
Helicity Mode ON/OFF Random/Toggle :
Wien BDL :
Wien field :
Laser attenuation Hall A :
Laser power Hall A :
Half-wave plate (off=out) :
Survey X offset bpmA : -0.63 !!WARNING!! The executable "caRepeater" couldnt be located because of errno = "No such file or directory" You may need to modify your PATH environment variable. Creating CA repeater with fork() system call. Repeater will inherit parents process name and resources. Duplicate resource consumption may occur.
Survey Y offset bpmA : -0.9
Survey X offset bpmB : 0.769
Survey Y offset bpmB : -1