    Log entry time 07:57:51 on August 5, 2001

    Entry number 69365

    keyword=Beam Time Accounting
    Hall A

    8/5/2001 0000-0800
    Experiment #: e97103
    Shift Leader: V. Sulkosky
    Shift Workers: X. Zhu, B. Milbrath

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    53.3 58.9 30 0 16.2 33 15 0 3.44
    Beam Available
    but Not in Use
    0 0 7 10 10 25 45 1 2.61666666666667
    Beam Not Available
    or Unacceptable
    6.7 1.1 23 50 33.8 2 0 0 1.94333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 30 50 50 35 15 0 5
    Planned Config-
    uration Change
    0 0 0 0 10 25 0 0 0.583333333333333
    Unplanned
    Experiment Down
    0 0 30 10 0 0 45 12.41666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 30 10 0 0 0 0 0.666666666666667
    Other 0 0 0 0 0 0 0 1 1

    Comments: 00:00 Continue data taking on Polarized 3He with beam 1/2 waveplate IN. 2:44 MCC is having magnet problems. Maybe a half hour to fix. 4:20 NMR/EPR measurements. 48 % polarization. 4:35 Beam back. 5:15 Finish elastic data taking on polarized 3He with beam half-wave plate out and collimators at 6mstr. 5:40 Configuration change of momentum to 1.123 Gev. 6:00 Numerous screens freezes during the hour caused us to lose right spectrometer information. There will be an access to reboot the crate for the right spectrometer.

    Data Entry by: Sulkosky