Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Michaels
Log entry time 17:19:29 on August 6,2001
Entry number 69625
keyword=charge asymmetry feedback results
During the day shift, the fig 1 below shows how well the charge
asymmetry was controlled using the "fast" feedback which is applied
after each 10 minute "minirun". Before we started, the beam had been
off for a few hours, the asymmetry was +366 ppm. This converged in
about 1/2 hour and remained below 100 ppm throughout the shift.
The only minor problem now is that the last feedback, at the end of a run,
is never applied. The bug is understood and will be fixed by A. Vacheret.
It typically affects only the last 5 minutes of a long run, but if the run is
shorter than one "minirun" (10 minutes) no feedback is applied.
FIGURE 1